Started looking routing of existing wires. Pulled all power, ground and lighting bus wires loose from the shielded cables to clean up routing. Added an Adele Clamp at one end of the bundle. Decided to finish cutting wires to the GAD 27, GEA 24 and the rest of the airframe before finalizing wire bundle routing and clamp positions.